Global Switch

global_switch

Global Switch Hong Kong

18 Chun Yat Street, Tseung Kwan O Industrial Estate, Sai Kung, Hong Kong

Customer
Global Switch

Building size
71,000sqm of infrastructure service supported by 100MVA utility power supply

Country
Hong Kong

Industry
Data Centres

Recommended resources
https://www.globalswitch.com.au/

Products & services
WillowDigital™
Digital Engineering

Overview of the Engagement

Global Switch is a data centre owner operator of 12 data centres located in tier 1 cities across Europe and Asia Pacific with a total of 365,000 sqm of world class technical space.

Following the success of delivering the Global Switch Sydney East Data Centre on the contractor side, Global Switch saw the value Willow provided to the project and the project team. Global Switch engaged Willow to provide Digital Project Management services to oversee the construction and Delivery of the Hong Kong Data Centre.

Project Milestones

WillowDigital™ Engineering engaged

September 2017

Completed Construction & Digital Delivery Handover

March 2021
  • WillowDigital™ Engineering engaged (September 2017)
  • Completed Construction & Digital Delivery Handover (September 2017)

Scope of Work

WillowDigital™ Engineering Services have been engaged to:

  • Formulate Global Switch Digital vision and plan the project objectives through a Briefing document with the end in mind
  • Ensuring contractor and project delivery team implement and follow Global Switch Digital requirements through the procurement and construction stages
  • Supporting Global Switch with decision making related to upcoming risk arising from site driven changes affecting the digital delivery process
  • Progressively review and audit 3D geometric model quality, tolerances and associated non-graphical meta data to meet Global Switch operational requirements
  • Review and Audit contractor final as-built models and Asset Data for Global Switch operations team

Benefits Derived

By engaging the WillowDigital™ team, the objectives Global Switch has for this project include:

  • Author the Global Switch Digital Strategy Framework ensuring consistent requirements are met from all future engaged parties portfolio wide
  • Communication of the design and coordination issues to all parties via a collaborative BIM environment
  • Digital models development used for cost estimate checks by Global Switch consultants
  • Global switch engaged in the on site model coordination process driven by the WillowDigital™ Project
  • Plant replacement strategies used and tested within the federated BIM models for future-proofing
  • Due to the coordination process, building components were per-fabricated on site and installed at the correct building location improving construction sequencing and efficiency
  • WillowDigital™ Project Team ensured a structured Asset Data record of the as built model is being delivered by the contractor for seamless integration with Global Switch operations FM System

Project Gallery

Close Menu

Download our brochure

We respect your time and privacy. This document is packed with valuable content. Could you share just a little information before downloading?

Sydney Light Rail

  • Sector: Light Rail
  • Size/scale:
    12 KM Span 19 stations
  • Architect: Grimshaw
  • Owner/Operator: Transport for NSW
  • Engaged by: Grimshaw
  • Willow’s role: Digital Architecture

The Ribbon

  • Sector: Hospitality, Residential (Serviced apartments)
  • Size/scale:
    54,800 sqm (589,862 sqft)
  • Architect: HASSELL (Design Architect)
  • Contractor: Grocon
  • Developer: Grocon
  • Owner/Operator: Greaton/W Hotel (Marriot Hotels)
  • Engaged by: Grocon
  • Willow’s role: Digital Engineering, Digital Architecture

The Star Sovereign Resort

  • Sector: Hospitality
  • Size/scale:
    148,644 sqm (1.6 million sqft)
  • Architect: HBA (Design)
  • Contractor: Built
  • Owner/Operator:
    The Star Entertainment
  • Engaged by: The Star Entertainment
  • Willow’s role: Digital Architecuture (Lead Consultant)

The Sandstones Precinct

  • Sector: Hospitality, Conference
  • Size/scale:
    30,000 sqm (322,917 sqft)
  • Architect: MAKE Architects
  • Contractor: Built
  • Owner/Operator:
    Pontiac Land Group
  • Developer: Pontiac Land Group
  • Engaged by: Pontiac Land Group
  • Willow’s role: Digital Architecture

480 Hay Street /
The Westin Hotel Perth

  • Sector: Hospitality, Commercial
  • Size/scale:
    48,000 sqm (516,667 sqft)
  • Architect: HASSELL
  • Contractor: BCG
  • Owner/Operator:
    Westin (Marriott Hotels)
  • Engaged by: HASSELL
  • Willow’s role: Digital Architecture

60 Martin Place

  • Sector: Commercial
  • Size/scale:
    40,000 sqm (430, 556 sqft)
  • Architect: HASSELL
  • Contractor: Lendlease
  • Developer: Investa
  • Owner/Operator: Investa
  • Engaged by: Investa
  • Willow’s role: Digital Engineering, WillowTwin™ platform

Pittsburgh International Airport

  • Sector: Aviation
  • Size/scale:
    58,714 sqm (631,992 sqft)
  • Architect: Gensler / Luis Videl & Architects
  • Owner/Operator: Pittsburgh International Airport
  • Engaged by: Pittsburgh International Airport
  • Willow’s role: Digital Engineering

Global Switch Ultimo

  • Sector: Data Centre
  • Size/scale:
    40,000 sqm (430,556 sqft)
  • Architect: DEM
  • Owner/Operator: Global Switch
  • Engaged by: Global Switch
  • Willow’s role: Digital Engineering

Summer Hill

  • Sector: Residential
  • Size/scale:
    24,789 sqm (266,826 sqft)
  • Architect: HASSELL
  • Developer: EG Funds
  • Engaged by: HASSELL
  • Willow’s role: Digital Architecture

Corporate Connect Stages 2 & 3

  • Sector: Commercial
  • Size/scale:
    30,000 sqm (322,917 sqft)
  • Architect: WMK
  • Contractor: Taylor Construction
  • Developer: Goodman
  • Owner/Operator: Goodman
  • Engaged by: Taylor Construction
  • Willow’s role: Digital Architecture

Tempo Drummoyne

  • Sector: Residential
  • Size/scale:
    4,000 sqm (43,055 sqft)
  • Architect: FKM
  • Developer: EG Funds
  • Engaged by: FKM
  • Willow’s role: Digital Architecture

Download our eBook

We respect your time and privacy. This document is packed with valuable content. Could you share just a little information before downloading?

Sydney Metro Martin Place

  • Sector: Commercial / Rail
  • Size/scale:
    20,000 sqm (236,806 sqft)
  • Architect: JPW, Grimshaw and Tzannes
  • Developer: Macquarie Group
  • Owner/Operator: Macquarie Group / Transport for NSW
  • Engaged by: Savills / Macquarie Group
  • Willow’s role: Digital Engineering

Barrack Place, 151 Clarence Street

  • Sector: Commercial
  • Size/scale:
    20,000 sqm (236,806 sqft)
  • Architect: Architectus
  • Contractor: Built
  • Developer: Investa
  • Owner/Operator: Investa
  • Engaged by: Investa
  • Willow’s role: Digital Engineering, WillowTwin™

567 Collins Street

  • Sector: Commercial
  • Size/scale:
    55,000 sqm (592,015 sqft)
  • Architect: COX and Spowers
  • Developer: Investa
  • Owner/Operator: Investa
  • Engaged by: Investa
  • Willow’s role: Digital Engineering, WillowTwin™

32 Smith Street

  • Sector: Commercial
  • Size/scale:
    26,000 sqm (279,861 sqft)
  • Architect: Fender Katsalidis
  • Owner/Operator: GPT
  • Engaged by: GPT
  • Willow’s role: Digital Engineering

100 Queens Street

  • Sector: Commercial
  • Size/scale:
    34,900 sqm (375,660 sqft)
  • Architect: Kirsten Thompson Architects
  • Owner/Operator: GPT Group
  • Engaged by: GPT Group
  • Willow’s role: Digital Engineering

477 Collins Street

  • Sector: Commercial
  • Size/scale:
    55,000 sqm (592,015 sqft)
  • Architect: Grimshaw
  • Owner/Operator: Mirvac
  • Engaged by: Mirvac
  • Willow’s role: Digital Engineering

Waterloo Road Campus

  • Sector: Commercial
  • Size/scale:
    120,773 sqm (1,229,990 sqft)
  • Architect: Architectus
  • Contractor: John Holland Group
  • Developer: John Holland Group
  • Owner/Operator: John Holland Group
  • Engaged by: John Holland Group
  • Willow’s role: Digital Engineering

Top Golf (various locations)

  • Sector: Hospitality
  • Size/scale:
    572,250-726,790 sqm (6,159,647-7,823,102 sqft)
  • Contractor: Arco Murray
  • Owner/Operator: Top Golf
  • Engaged by: Arco Murray
  • Willow’s role: Digital Engineering

Queens Plaza Park

  • Sector: Commercial Multi-Family
  • Size/scale:
    92,903 sqm (1 million sqft)
  • Architect: Handel Architects
  • Developer: Durst Organisation
  • Owner/Operator: Durst Organisation
  • Engaged by: Durst Organisation
  • Willow’s role: Digital Engineering, WillowTwin™ platform
We use cookies to improve your experience on our website by personalising content and advertising, and to analyse our traffic. We also share information about your use of our website with our affiliates and partners. By clicking ACCEPT, you consent to our use of cookies. You can change your mind at any time by taking the steps set out in our Privacy Policy, where you can also learn more about how we use your cookies.